Friday 8 March 2013

summer project

I did everything from drawing the blueprints to pouring the concrete footings. The door initially opened directly on to the staircase, which I simply removed, and then reattached after the deck was finished. Took about 2 weeks (half of which was shopping time, and waiting for the concrete to dry), and cost just under $2000 (not including materials)



.











No comments:

Post a Comment